resource-development
Original:🇺🇸 English
Translated
Use when the contract is signed and work packages need to be created — decomposes the contract into bite-sized tasks, sets up git isolation, allocates territories and token budgets, producing the war plan
8installs
Sourcekucherenko/gangsta
Added on
NPX Install
npx skill4agent add kucherenko/gangsta resource-developmentTags
Translated version includes tags in frontmatterSKILL.md Content
View Translation Comparison →Resource Development: Infrastructure and Tooling
Overview
The Underboss decomposes the signed Contract into Work Packages, sets up infrastructure for parallel execution, and produces the War Plan — the detailed task breakdown that governs The Hit.
Trigger
Invoked after the Don signs the Contract (The Sit-Down complete).
Process
Step 1: Decompose Contract into Work Packages
For each requirement in the Contract:
- Identify affected files (create/modify)
- Determine territory ownership (which Capo)
- Define acceptance criteria (from Contract)
- Write verification command
- Estimate token budget
Each Work Package must be:
- Independent — Can be implemented without waiting for other Work Packages (within the same territory, order may matter)
- Verifiable — Has a specific test or command that proves it works
- Bite-sized — 2-5 minutes of Soldier work
- Traceable — References a specific Contract clause
Step 2: Define Territories
Group Work Packages by domain and define Capo territories:
markdown
## Territory: <Name>
**Domain:** <Description>
**Files:** <Glob patterns>
**Work Packages:** WP-001, WP-003, WP-007
**Soldiers:** <Parallel count>
**Budget:** <Token allocation>Step 3: Set Up Isolation
If the project uses git:
- Create a branch for the Heist:
heist/<heist-name> - Optionally create worktrees per territory for true parallel work
If not:
- Document the isolation strategy (directory copies, etc.)
Step 4: Verify Prerequisites
Before The Hit begins:
- All existing tests pass on the current baseline
- Required dependencies are available
- File paths in Work Packages are valid
- No merge conflicts with the base branch
Step 5: Produce War Plan
Compile everything into the War Plan.
War Plan Format
Save to:
docs/gangsta/<heist-name>/plans/YYYY-MM-DD-war-plan.mdmarkdown
---
heist: <heist-name>
date: YYYY-MM-DD
total-work-packages: <N>
territories: <N>
estimated-total-budget: <tokens>
---
# War Plan: <Heist Name>
## Territories
### Territory: <Name 1>
**Capo Domain:** <description>
**Files:** <globs>
**Soldiers:** <N parallel>
**Budget:** <tokens>
### Territory: <Name 2>
...
## Work Packages
### WP-001: <Title>
**Territory:** <Name>
**Contract Clause:** FR-001
**Files:**
- Create: `path/to/file`
- Test: `tests/path/to/test`
**Acceptance Criteria:**
1. <criterion>
**Verification:** `<command>`
**Budget:** <tokens>
**Dependencies:** None | WP-XXX
### WP-002: <Title>
...
## Execution Order
1. Independent packages (can run in parallel): WP-001, WP-002, WP-005
2. Depends on group 1: WP-003 (needs WP-001)
3. ...
## Baseline Verification
- Tests: <PASS/FAIL — must be PASS>
- Dependencies: <OK/MISSING>
- Branch: heist/<heist-name> created from <base>Step 6: Don Approves War Plan
Present to the Don:
"War Plan ready. <N> Work Packages across <N> territories. Estimated budget: <tokens>. Ready to execute The Hit?"
Checkpoint
yaml
---
heist: <heist-name>
phase: resource-development
status: completed
timestamp: <ISO 8601>
next-action: Proceed to The Hit
artifacts:
- docs/gangsta/<heist-name>/plans/YYYY-MM-DD-war-plan.md
---Omerta Compliance
- Spec is Law: Every Work Package traces to a Contract clause
- Rule of Tribute: Token budgets allocated per territory
- Rule of Availability: War Plan and checkpoint saved