soc2-readiness

Compare original and translation side by side

🇺🇸

Original

English
🇨🇳

Translation

Chinese

SOC 2 Readiness

SOC 2 准备就绪

Drive an organization from "no controls documented" to audit-ready.
推动组织从“未记录任何控制措施”走向审计就绪。

1. Scoping

1. 范围界定

  • Determine report type: Type I (point-in-time) vs Type II (period of time — start the observation window early)
  • Define the system description: services in scope, infrastructure, boundaries (subprocessors, cloud providers)
  • Select Trust Services Criteria: Security (required) + Availability, Confidentiality, Processing Integrity, Privacy as applicable
  • 确定报告类型:Type I(某一时间点)还是 Type II(某一时间段——尽早启动观察窗口)
  • 界定系统描述:纳入范围的服务、基础设施和边界(子处理方、云服务提供商)
  • 选择 Trust Services Criteria:Security(必选),以及适用时的 Availability、Confidentiality、Processing Integrity、Privacy

2. Gap Assessment

2. 差距评估

Map current practices to the criteria:
AreaTypical CriteriaCommon Gaps
Access controlCC6.1–CC6.3No MFA, no role-based access, shared accounts
Change managementCC8.1No peer review on deploys, no environment separation
Risk assessmentCC3.1–CC3.4No annual risk assessment or vendor reviews
MonitoringCC7.1–CC7.3No log review, no alerting on anomalies
Incident responseCC7.4–CC7.5No IR plan or tabletop evidence
BC/DRA1.2–A1.3Untested backups, no documented RTO/RPO
Vendor managementCC9.2No subprocessor due diligence
Onboarding/offboardingCC6.1Access removal not timely or evidenced
将当前实践映射到各项标准:
领域典型标准常见差距
访问控制CC6.1–CC6.3未启用 MFA、缺少基于角色的访问控制、存在共享账号
变更管理CC8.1部署缺少同级审查、未隔离环境
风险评估CC3.1–CC3.4未开展年度风险评估或供应商审查
监控CC7.1–CC7.3未审查日志、未对异常情况发出告警
事件响应CC7.4–CC7.5缺少事件响应计划或桌面演练证据
BC/DRA1.2–A1.3备份未经测试、未记录 RTO/RPO
供应商管理CC9.2未对子处理方开展尽职调查
入职/离职管理CC6.1访问权限未被及时撤销或缺少相关记录

3. Remediation

3. 整改

  • Prioritize by audit-blocker status first, then risk
  • Implement policy + practice + evidence together: a policy without execution evidence fails
  • Typical timeline: 2–4 months for a Type I; Type II needs 2–12 months of operating evidence
  • 首先根据审计阻断项的状态确定优先级,其次再根据风险排序
  • 同时落实政策、实践和证据:只有政策而没有执行证据将无法通过审计
  • 典型时间线:Type I 通常需要 2–4 个月;Type II 需要 2–12 个月的运行证据

4. Evidence Package

4. 证据包

Per control: policy documents, implementation artifacts (screenshots, configs), and dated operating evidence over the review period (access reviews, change tickets, training logs, IR exercises)
针对每项控制准备:政策文档、实施材料(截图、配置),以及审查期间带有日期的运行证据(访问权限审查、变更工单、培训记录、事件响应演练)

5. Audit Logistics

5. 审计安排

  • Choose auditor; confirm scope wording matches your system description
  • Readiness assessment (optional but useful) → fieldwork → draft report review
  • Track findings/exceptions honestly; management responses documented
  • 选择审计机构;确认范围表述与系统描述一致
  • 准备度评估(可选但有帮助)→ 现场审计工作 → 审阅报告草案
  • 如实跟踪审计发现/例外,并记录管理层回应

Output

输出

Gap register with owners and dates, control matrix mapped to criteria, evidence repository structure, and auditor-ready system description.
包含负责人和日期的差距登记表、映射到各项标准的控制矩阵、证据库结构,以及可供审计方使用的系统描述。