milestone-planning
Compare original and translation side by side
🇺🇸
Original
English🇨🇳
Translation
ChineseMilestone Planning
里程碑规划
Purpose
目标
Build milestone plans that are dependency-aware, risk-aware, and tied to real delivery outcomes.
构建具备依赖感知、风险感知且与实际交付成果挂钩的里程碑计划。
Use When
适用场景
- entering pre-production or production
- scope has changed materially
- the team needs a realistic plan instead of a loose backlog
- 进入预生产或生产阶段
- 范围发生重大变更
- 团队需要一份切合实际的计划而非松散的待办事项列表
Inputs
输入项
- current scope
- team capacity
- dependencies
- risk register
- technical and content constraints
- 当前范围
- 团队产能
- 依赖关系
- 风险登记册
- 技术与内容约束
Process
流程
- define milestone purpose, entry criteria, and exit criteria
- break work into feature-sized deliverables with owners
- sequence dependencies and identify blockers early
- reserve capacity for integration, QA, and rework
- mark candidate descopes and optional stretch items
- 定义里程碑的目标、进入标准和退出标准
- 将工作拆解为具备负责人的功能级交付项
- 梳理依赖顺序,尽早识别阻塞点
- 预留整合、QA、和返工的产能
- 标记候选缩减范围项和可选拓展项
Outputs
输出成果
- milestone plan
- dependency map
- ownership list
- risk-aware scope breakdown
- 里程碑计划
- 依赖关系图
- 负责人清单
- 具备风险感知的范围拆解
Quality Bar
质量标准
- each milestone has exit criteria a reviewer can check without interpretation
- dependencies between workstreams are mapped before dates are committed
- every milestone names its owner and the decision that unblocks the next one
- risks carry probability, impact, and a named mitigation owner
- 每个里程碑都有无需解读即可供审核者检查的退出标准
- 在确定日期前,已梳理各工作流之间的依赖关系
- 每个里程碑都明确其负责人以及解锁下一个里程碑的决策事项
- 风险需包含发生概率、影响程度以及指定的缓解措施负责人
Common Failure Modes
常见失败模式
- milestones defined by dates instead of demonstrable outcomes
- hidden dependencies discovered mid-milestone, invalidating the schedule
- "90% done" syndrome — no binary exit criteria to call a milestone complete
- risk lists written once at kickoff and never re-reviewed
- 里程碑按日期而非可验证成果定义
- 在里程碑执行中期发现隐藏依赖,导致计划失效
- “完成90%”综合征——没有明确的二元退出标准来判定里程碑是否完成
- 风险清单仅在启动时编写一次,后续从未重新审核
Related Agents
相关Agent
- producer
- planner
- technical-design-lead
- producer
- planner
- technical-design-lead
Related Commands
相关命令
- milestone-plan
- plan
- orchestrate
- milestone-plan
- plan
- orchestrate
Notes
注意事项
- Keep this skill aligned with the relevant rules layer and current project documentation.
- If engine-specific constraints materially change the workflow, hand off to the matching engine skill or engine-specific reviewer.
- 确保此skill与相关规则层及当前项目文档保持一致;
- 如果引擎特定约束导致工作流程发生重大变更,请移交至匹配的引擎skill或引擎特定审核人员。