granola-prod-checklist
Compare original and translation side by side
🇺🇸
Original
English🇨🇳
Translation
ChineseGranola Production Checklist
Granola生产就绪检查清单
Contents
目录
Overview
概述
Comprehensive checklist for deploying Granola in a production/enterprise environment covering security, integrations, training, and go-live procedures.
一份针对生产/企业环境中部署Granola的全面检查清单,涵盖安全、集成、培训及上线流程等内容。
Prerequisites
前置条件
- Appropriate Granola plan selected (Pro/Business/Enterprise)
- Sufficient seat licenses for team
- Admin access to Granola workspace
- 已选择合适的Granola套餐(专业版/商务版/企业版)
- 拥有足够的团队席位许可证
- 具备Granola工作区的管理员权限
Instructions
实施步骤
Step 1: Account & Licensing
步骤1:账户与许可证
- Plan selected and billing verified
- Contract/Terms reviewed and signed
- Enterprise agreement in place (if applicable)
- 已选定套餐并完成账单验证
- 已审阅并签署合同/条款
- 已签订企业协议(如适用)
Step 2: Security Configuration
步骤2:安全配置
Configure SSO, 2FA, password policies, IP allowlisting, data residency, and audit logging.
配置单点登录(SSO)、双因素认证(2FA)、密码策略、IP白名单、数据驻留及审计日志。
Step 3: Integration Setup
步骤3:集成设置
Connect calendar (Google/Outlook), communication (Slack/Teams), documentation (Notion/Confluence), and optionally CRM and task management tools.
连接日历(Google/Outlook)、通讯工具(Slack/Teams)、文档工具(Notion/Confluence),可选连接CRM及任务管理工具。
Step 4: Workspace & User Configuration
步骤4:工作区与用户配置
Set workspace branding, sharing permissions, data retention, templates, user roles, and permission groups.
设置工作区品牌、共享权限、数据保留策略、模板、用户角色及权限组。
Step 5: Run Pilot Program
步骤5:运行试点项目
Select 5-10 pilot users, define success metrics, run for 2 weeks, collect daily feedback, and address issues before full rollout.
选择5-10名试点用户,定义成功指标,运行2周时间,收集每日反馈并在全面推广前解决问题。
Step 6: Go-Live
步骤6:正式上线
Execute launch day checklist: send welcome emails, enable access, monitor adoption, staff support channel. Track metrics daily for first week.
See detailed implementation for complete checklists, technical requirements, network configuration, training plans, and success metrics.
执行上线日检查清单:发送欢迎邮件、启用访问权限、监控用户采用情况、安排支持渠道。上线首周每日跟踪指标。
查看详细实施内容获取完整检查清单、技术要求、网络配置、培训计划及成功指标。
Output
输出结果
- Security fully configured (SSO, 2FA, audit logging)
- Integrations connected and tested
- Pilot completed with feedback incorporated
- Team onboarded and recording meetings
- 安全配置已完成(SSO、2FA、审计日志)
- 集成已连接并测试通过
- 试点项目完成并已整合反馈
- 团队已完成入职培训并开始录制会议
Error Handling
错误处理
| Error | Cause | Solution |
|---|---|---|
| SSO login failure | Misconfigured SAML/OIDC | Verify SSO settings with identity provider |
| Calendar not syncing | OAuth token expired | Reconnect calendar integration |
| Low adoption | Insufficient training | Schedule additional training sessions |
| Recording not starting | Missing permissions | Verify microphone and calendar permissions |
| 错误 | 原因 | 解决方案 |
|---|---|---|
| SSO登录失败 | SAML/OIDC配置错误 | 与身份提供商验证SSO设置 |
| 日历同步失败 | OAuth令牌过期 | 重新连接日历集成 |
| 用户采用率低 | 培训不足 | 安排额外的培训课程 |
| 录制无法启动 | 权限缺失 | 验证麦克风及日历权限 |
Examples
示例
Quick Adoption Check (Week 1)
首周快速采用情况检查
| Metric | Target | Actual |
|---|---|---|
| User activation | 80% | ___ |
| Meetings captured | 70% | ___ |
| Support tickets | <5% users | ___ |
| 指标 | 目标值 | 实际值 |
|---|---|---|
| 用户激活率 | 80% | ___ |
| 会议捕获率 | 70% | ___ |
| 支持工单占比 | <5% 用户 | ___ |
Resources
参考资源
Next Steps
下一步操作
Proceed to for version upgrade guidance.
granola-upgrade-migration请查看获取版本升级指导。
granola-upgrade-migration