When to Use
适用场景
- Build or refresh a multi-site data center capacity roadmap (3–5+ years)
- Prioritize competing DC investments under a fixed capex envelope
- Run portfolio governance: stage gates, RAID, dependencies between DC projects
- Align regional strategy (latency, sovereignty, DR, cloud burst)
- Consolidate business cases from site leads into one portfolio narrative
- Track execution across concurrent builds, expansions, refreshes, and exits
- Prepare steering or board-level DC portfolio status
- Decide build vs colo vs extend vs cloud at portfolio level
- 制定或更新多站点数据中心容量路线图(3-5年及以上)
- 在固定capex预算范围内对相互竞争的数据中心投资进行优先级排序
- 开展组合治理:阶段门、RAID、数据中心项目间的依赖关系管理
- 对齐区域策略(延迟、主权、DR、云突发)
- 将站点负责人提交的业务案例整合为统一的组合说明
- 跟踪并行开展的新建、扩容、升级与退出工作的执行情况
- 准备面向指导委员会或董事会的数据中心组合状态报告
- 在组合层面决策新建、colo、扩容还是采用云服务
When NOT to Use
不适用场景
- Single facility design, MEP, commissioning →
data-center-design-execution-lead - Server/GPU utilization, consolidation, refresh tactics →
data-center-compute-supply-efficiency - Multi-team software program (no DC portfolio) →
technical-program-manager - Corporate strategy, operating model, issue trees →
business-consultant - Terraform, VPC, K8s foundation →
infrastructure-engineer - K8s cluster operations →
cluster-deployment-engineer - Launch messaging only →
communication-lead - MW/rack delivery program and readiness gates →
senior-data-center-capacity-delivery-manager
- 单一设施设计、MEP、调试 →
data-center-design-execution-lead - 服务器/GPU利用率优化、整合、升级策略 →
data-center-compute-supply-efficiency - 多团队软件项目(无数据中心组合) →
technical-program-manager - 企业战略、运营模式、问题树分析 →
business-consultant - Terraform、VPC、K8s基础架构 →
infrastructure-engineer - K8s集群运维 →
cluster-deployment-engineer - 仅负责发布宣传信息 →
communication-lead - 兆瓦/机架交付项目与就绪门管理 →
senior-data-center-capacity-delivery-manager
Related skills
相关技能
| Need | Skill |
|---|---|
| Infrastructure capex policy and capitalization | |
| One site design and build execution | |
| Compute supply and efficiency | |
| Cross-functional software delivery program | |
| Investment narrative and options | |
| Hybrid cloud technical patterns | |
| Compliance evidence for facilities | |
| Executive updates | |
| Capacity delivery execution | |
| 需求 | 技能 |
|---|---|
| 基础设施capex政策与资本化 | |
| 单一站点设计与建设执行 | |
| 计算资源供应与效率优化 | |
| 跨职能软件交付项目 | |
| 投资说明与方案制定 | |
| 混合云技术模式 | |
| 设施合规证据准备 | |
| 高管汇报 | |
| 容量交付执行 | |
Core Workflows
核心工作流程
1. Portfolio charter and scope
1. 组合章程与范围定义
Define:
- Sites in scope — owned, colo, edge, planned
- Horizon — planning years and refresh cycles
- Constraints — capex ceiling, power at utility, sustainability targets
- Decision rights — steering, stage gates, who owns site DRIs
See .
references/portfolio_charter.md定义:
- 纳入范围的站点——自有、colo、边缘、规划中
- 规划周期——规划年限与升级周期
- 约束条件——capex上限、市电供电能力、可持续发展目标
- 决策权限——指导委员会、阶段门、站点DRI负责人
参考 。
references/portfolio_charter.md2. Capacity and demand rollup
2. 容量与需求汇总
- Aggregate demand by region (kW, racks, GPUs) from engineering and product
- Map to supply per site (committed, available, planned)
- Expose gaps by quarter and region
- Flag single points of failure (one site, one carrier, one cooling plant)
See .
references/capacity_roadmap.md- 汇总来自工程与产品部门的区域需求(千瓦、机架、GPU)
- 匹配各站点的供应能力(已承诺、可用、规划中)
- 按季度和区域呈现供需缺口
- 标记单点故障风险(单一站点、单一运营商、单一冷却系统)
参考 。
references/capacity_roadmap.md3. Investment prioritization
3. 投资优先级排序
Score initiatives: strategic fit, risk reduction, NPV/TCO, dependency unlock, time criticality.
Output: ranked backlog, funded / deferred / kill, and tradeoff narrative.
See .
references/investment_prioritization.md对举措进行评分:战略契合度、风险降低程度、NPV/TCO、依赖解锁情况、时间紧迫性。
输出内容:排序后的待办事项列表、立项/推迟/终止状态,以及权衡说明。
参考 。
references/investment_prioritization.md4. Execution governance
4. 执行治理
- Stage gates — concept → approved → execute → operate
- Portfolio RAID — risks that span sites (power, lead time, vendor)
- Dependency map — e.g. network build before hall acceptance
- Integrate site-level status from DRIs
data-center-design-execution-lead
See .
references/execution_governance.md- 阶段门——概念→获批→执行→运维
- 组合RAID——跨站点风险(电力、交付周期、供应商)
- 依赖关系图——例如,网络建设需在机房验收前完成
- 整合来自DRI的站点级状态信息
data-center-design-execution-lead
参考 。
references/execution_governance.md5. Hybrid and exit strategy
5. 混合策略与退出策略
- Portfolio rules for cloud burst vs committed metal
- Site exit or consolidation when utilization and TCO favor move
- Contract and migration dependencies
See .
references/hybrid_exit_strategy.md- 制定组合层面的云突发与专属硬件规则
- 当利用率与TCO支持迁移时,执行站点退出或整合
- 管理合同与迁移依赖关系
参考 。
references/hybrid_exit_strategy.md6. Steering reporting
6. 指导委员会汇报
Monthly/quarterly: portfolio health (RAG), spend vs plan, milestone slip, top risks, decisions needed.
See .
references/steering_reporting.md每月/每季度:组合健康状况(RAG状态)、实际支出vs计划、里程碑延误情况、顶级风险、待决策事项。
参考 。
references/steering_reporting.mdOutput standards
输出标准
- One-page portfolio summary + detailed initiative register
- Roadmap by region (kW/racks/GPUs) with assumptions stated
- Prioritization scorecard with explicit tradeoffs
- Decision log for steering (what was decided, what was deferred)
- No duplicate site engineering detail — link to site workstreams
- 一页式组合摘要 + 详细举措登记册
- 按区域划分的路线图(千瓦/机架/GPU),并注明假设条件
- 包含明确权衡说明的优先级评分卡
- 指导委员会决策日志(已决策事项、推迟事项)
- 不重复站点工程细节——链接至站点工作流
When to load references
何时加载参考文档
- Charter and roles →
references/portfolio_charter.md - Multi-site roadmap →
references/capacity_roadmap.md - Scoring and funding →
references/investment_prioritization.md - Gates, RAID, dependencies →
references/execution_governance.md - Cloud, colo, exit →
references/hybrid_exit_strategy.md - Steering pack →
references/steering_reporting.md
- 章程与角色 →
references/portfolio_charter.md - 多站点路线图 →
references/capacity_roadmap.md - 评分与立项 →
references/investment_prioritization.md - 阶段门、RAID、依赖关系 →
references/execution_governance.md - 云、colo、退出 →
references/hybrid_exit_strategy.md - 指导委员会汇报包 →
references/steering_reporting.md