last-responsible-moment
Compare original and translation side by side
🇺🇸
Original
English🇨🇳
Translation
ChineseLast Responsible Moment
最后责任时刻(Last Responsible Moment)
Apply to the current workflow without restarting it or expanding scope.
Bring learning forward, not commitment. Preserve options without stalling delivery.
应用于当前工作流,不重启流程,也不扩大范围。
提前促成学习,而不是提前作出承诺;在不拖延交付的同时保留选择空间。
Decision triage
决策分流
Consider the next increment, reversibility, cost of delay, expected learning,
and required lead time.
- Decide now: the choice is necessary to move forward or define verifiable behavior; waiting disproportionately increases cost or risk, or eliminates an important option.
- Investigate now: an uncertainty could invalidate the approach. Seek evidence in code, documents, measurements, or minimal experiments without requiring a definitive commitment.
- Choose provisionally: to move forward, adopt the simplest alternative when reversal is cheap, no important option is lost, and authority has been delegated. Do not invent requirements or business rules.
- Defer deliberately: keep an unnecessary choice open when the cost of waiting is acceptable, especially when relevant learning is still ahead. Record only the question, reason, and observable trigger; allow lead time to investigate, implement, and validate.
考虑下一增量、可逆性、延期成本、预期学习收益以及所需提前期。
- 立即决定: 该选择对于推进工作或界定可验证行为是必要的;继续等待会不成比例地增加成本或风险,或者消除重要选项。
- 立即调查: 某项不确定性可能使当前方案失效。应从代码、文档、测量结果或最小化实验中寻找证据,而无需作出最终承诺。
- 暂定选择: 为继续推进,在回退成本低、不会失去重要选项且决策权限已获下放的情况下,采用最简单的替代方案。不得臆造需求或业务规则。
- 有意推迟: 当等待成本可以接受时,尤其是相关学习仍可继续推进时,将不必要的选择保持开放。仅记录问题、原因和可观察的触发条件;同时为调查、实施和验证留出充足时间。
Boundaries
边界
Also defer branches that depend on deferred decisions, except for independently
relevant risks. Out of scope does not imply a future commitment.
Prefer evidence over preference questions. When user input is needed, present one
decision at a time, a recommendation, and why the decision is needed now.
YAGNI: preserve ease of change, not speculative abstractions, configuration,
or infrastructure. Do not confuse importance with irreversibility, or deferring
a solution with deferring investigation.
Distinguish decisions, hypotheses, and deferrals in existing documents. Record
only what affects continuity; do not create exhaustive inventories or an ADR for
every pending issue. Reassess commitments and triggers as new evidence emerges.
对于依赖已推迟决策的分支,也应推迟处理,但可独立评估的相关风险除外。范围之外并不意味着未来必须作出承诺。
优先依据证据,而不是偏好问题。需要用户输入时,每次只呈现一个决策、一项建议,以及为什么现在必须决定。
YAGNI: 保持变更的便利性,而不是引入推测性的抽象、配置或基础设施。不要将重要性与不可逆性混为一谈,也不要将推迟解决方案等同于推迟调查。
在现有文档中区分决策、假设和延期事项。仅记录影响工作连续性的内容;不要为每个待决问题创建详尽清单或 ADR。随着新证据出现,应重新评估承诺和触发条件。
Stopping criterion
停止标准
In planning and questioning, replace exhaustive exploration of the decision tree
with readiness of the next increment: clear, executable, and verifiable, with no
hidden business assumptions or unaddressed material risks.
End deliberation once this criterion is met. Proceed within existing
authorization. Communicate only relevant adjustments and blockers; do not turn
this skill into another planning ceremony.
在规划和提问过程中,以下一增量的就绪状态取代对决策树的全面探索:下一增量应清晰、可执行、可验证,且不包含隐藏的业务假设或尚未处理的重大风险。
达到此标准后即结束讨论。在现有授权范围内继续执行。仅沟通相关调整和阻塞项;不要把这个 skill 变成另一场规划仪式。