Loading...
Loading...
Medical device risk management specialist implementing ISO 14971 throughout product lifecycle. Provides risk analysis, risk evaluation, risk control, and post-production information analysis.
npx skill4agent add alirezarezvani/claude-skills risk-management-specialist| Section | Content | Evidence |
|---|---|---|
| Scope | Device and lifecycle coverage | Scope statement |
| Criteria | Risk acceptability matrix | Risk matrix document |
| Responsibilities | Roles and authorities | RACI chart |
| Verification | Methods and acceptance | Verification plan |
| Production/Post-Production | Monitoring activities | Surveillance plan |
| Probability \ Severity | Negligible | Minor | Serious | Critical | Catastrophic |
|---|---|---|---|---|---|
| Frequent (P5) | Medium | High | High | Unacceptable | Unacceptable |
| Probable (P4) | Medium | Medium | High | High | Unacceptable |
| Occasional (P3) | Low | Medium | Medium | High | High |
| Remote (P2) | Low | Low | Medium | Medium | High |
| Improbable (P1) | Low | Low | Low | Medium | Medium |
| Level | Acceptable | Action Required |
|---|---|---|
| Low | Yes | Document and accept |
| Medium | ALARP | Reduce if practicable; document rationale |
| High | ALARP | Reduction required; demonstrate ALARP |
| Unacceptable | No | Design change mandatory |
| Category | Examples | Analyzed |
|---|---|---|
| Electrical | Shock, burns, interference | ☐ |
| Mechanical | Crushing, cutting, entrapment | ☐ |
| Thermal | Burns, tissue damage | ☐ |
| Radiation | Ionizing, non-ionizing | ☐ |
| Biological | Infection, biocompatibility | ☐ |
| Chemical | Toxicity, irritation | ☐ |
| Software | Incorrect output, timing | ☐ |
| Use Error | Misuse, perception, cognition | ☐ |
| Environment | EMC, mechanical stress | ☐ |
| Situation | Recommended Method |
|---|---|
| Component failures | FMEA |
| System-level failure | FTA |
| Process deviations | HAZOP |
| User interaction | Use Error Analysis |
| Software behavior | Software FMEA |
| Early design phase | PHA |
| Level | Name | Description | Frequency |
|---|---|---|---|
| P5 | Frequent | Expected to occur | >10⁻³ |
| P4 | Probable | Likely to occur | 10⁻³ to 10⁻⁴ |
| P3 | Occasional | May occur | 10⁻⁴ to 10⁻⁵ |
| P2 | Remote | Unlikely | 10⁻⁵ to 10⁻⁶ |
| P1 | Improbable | Very unlikely | <10⁻⁶ |
| Level | Name | Description | Harm |
|---|---|---|---|
| S5 | Catastrophic | Death | Death |
| S4 | Critical | Permanent impairment | Irreversible injury |
| S3 | Serious | Injury requiring intervention | Reversible injury |
| S2 | Minor | Temporary discomfort | No treatment needed |
| S1 | Negligible | Inconvenience | No injury |
Risk Estimated
│
▼
Apply Acceptability Criteria
│
├── Low Risk ──────────► Accept and document
│
├── Medium Risk ───────► Consider risk reduction
│ │ Document ALARP if not reduced
│ ▼
│ Practicable to reduce?
│ │
│ Yes──► Implement control
│ No───► Document ALARP rationale
│
├── High Risk ─────────► Risk reduction required
│ │ Must demonstrate ALARP
│ ▼
│ Implement control
│ Verify residual risk
│
└── Unacceptable ──────► Design change mandatory
Cannot proceed without control| Criterion | Evidence Required |
|---|---|
| Technical feasibility | Analysis of alternative controls |
| Proportionality | Cost-benefit of further reduction |
| State of the art | Comparison to similar devices |
| Stakeholder input | Clinical/user perspectives |
| Situation | Benefit-Risk Required |
|---|---|
| Residual risk remains high | Yes |
| No feasible risk reduction | Yes |
| Novel device | Yes |
| Unacceptable risk with clinical benefit | Yes |
| All risks low | No |
| Priority | Control Type | Examples | Effectiveness |
|---|---|---|---|
| 1 | Inherent Safety | Eliminate hazard, fail-safe design | Highest |
| 2 | Protective Measures | Guards, alarms, automatic shutdown | High |
| 3 | Information | Warnings, training, IFU | Lower |
RISK CONTROL OPTION ANALYSIS
Hazard ID: H-[XXX]
Hazard: [Description]
Initial Risk: P[X] × S[X] = [Level]
OPTIONS CONSIDERED:
| Option | Control Type | New Hazards | Feasibility | Selected |
|--------|--------------|-------------|-------------|----------|
| 1 | [Type] | [Yes/No] | [H/M/L] | [Yes/No] |
| 2 | [Type] | [Yes/No] | [H/M/L] | [Yes/No] |
SELECTED CONTROL: Option [X]
Rationale: [Justification for selection]
IMPLEMENTATION:
- Requirement: [REQ-XXX]
- Design Document: [Reference]
VERIFICATION:
- Method: [Test/Analysis/Review]
- Protocol: [Reference]
- Acceptance Criteria: [Criteria]| Method | When to Use | Evidence |
|---|---|---|
| Test | Quantifiable performance | Test report |
| Inspection | Physical presence | Inspection record |
| Analysis | Design calculation | Analysis report |
| Review | Documentation check | Review record |
| After Control | Action |
|---|---|
| Acceptable | Document, proceed |
| ALARP achieved | Document rationale, proceed |
| Still unacceptable | Additional control or design change |
| New hazard introduced | Analyze and control new hazard |
| Source | Information Type | Review Frequency |
|---|---|---|
| Complaints | Use issues, failures | Continuous |
| Service | Field failures, repairs | Monthly |
| Vigilance | Serious incidents | Immediate |
| Literature | Similar device issues | Quarterly |
| Regulatory | Authority feedback | As received |
| Clinical | PMCF data | Per plan |
| Trigger | Response Time | Action |
|---|---|---|
| Serious incident | Immediate | Full risk review |
| New hazard identified | 30 days | Risk analysis update |
| Trend increase | 60 days | Trend analysis |
| Design change | Before implementation | Impact assessment |
| Standards update | Per transition period | Gap analysis |
| Review Element | Frequency |
|---|---|
| Risk management file completeness | Annual |
| Risk control effectiveness | Annual |
| Post-market information analysis | Quarterly |
| Risk-benefit conclusions | Annual or on new data |
HAZARD ANALYSIS WORKSHEET
Product: [Device Name]
Document: HA-[Product]-[Rev]
Analyst: [Name]
Date: [Date]
| ID | Hazard | Hazardous Situation | Harm | P | S | Initial Risk | Control | Residual P | Residual S | Final Risk |
|----|--------|---------------------|------|---|---|--------------|---------|------------|------------|------------|
| H-001 | [Hazard] | [Situation] | [Harm] | [1-5] | [1-5] | [Level] | [Control ref] | [1-5] | [1-5] | [Level] |FMEA WORKSHEET
Product: [Device Name]
Subsystem: [Subsystem]
Analyst: [Name]
Date: [Date]
| ID | Item | Function | Failure Mode | Effect | S | Cause | O | Control | D | RPN | Action |
|----|------|----------|--------------|--------|---|-------|---|---------|---|-----|--------|
| FM-001 | [Item] | [Function] | [Mode] | [Effect] | [1-10] | [Cause] | [1-10] | [Detection] | [1-10] | [S×O×D] | [Action] |
RPN Action Thresholds:
>200: Critical - Immediate action
100-200: High - Action plan required
50-100: Medium - Consider action
<50: Low - MonitorRISK MANAGEMENT REPORT
Product: [Device Name]
Date: [Date]
Revision: [X.X]
SUMMARY:
- Total hazards identified: [N]
- Risk controls implemented: [N]
- Residual risks: [N] Low, [N] Medium, [N] High
- Overall conclusion: [Acceptable / Not Acceptable]
RISK DISTRIBUTION:
| Risk Level | Before Control | After Control |
|------------|----------------|---------------|
| Unacceptable | [N] | 0 |
| High | [N] | [N] |
| Medium | [N] | [N] |
| Low | [N] | [N] |
CONTROLS IMPLEMENTED:
- Inherent safety: [N]
- Protective measures: [N]
- Information for safety: [N]
OVERALL RESIDUAL RISK: [Acceptable / ALARP Demonstrated]
BENEFIT-RISK CONCLUSION: [If applicable]
APPROVAL:
Risk Management Lead: _____________ Date: _______
Quality Assurance: _____________ Date: _______What is the risk level?
│
├── Unacceptable ──► Can hazard be eliminated?
│ │
│ Yes─┴─No
│ │ │
│ ▼ ▼
│ Eliminate Can protective
│ hazard measure reduce?
│ │
│ Yes─┴─No
│ │ │
│ ▼ ▼
│ Add Add warning
│ protection + training
│
└── High/Medium ──► Apply hierarchy
starting at Level 1| Question | If Yes | If No |
|---|---|---|
| Does control introduce new hazard? | Analyze new hazard | Proceed |
| Is new risk higher than original? | Reject control option | Acceptable trade-off |
| Can new hazard be controlled? | Add control | Reject control option |
| Condition | Decision |
|---|---|
| All risks Low | Acceptable |
| Medium risks with ALARP | Acceptable |
| High risks with ALARP documented | Acceptable if benefits outweigh |
| Any Unacceptable residual | Not acceptable - redesign |
| Tool | Purpose | Usage |
|---|---|---|
| risk_matrix_calculator.py | Calculate risk levels and FMEA RPN | |
| Document | Content |
|---|---|
| iso14971-implementation-guide.md | Complete ISO 14971:2019 implementation with templates |
| risk-analysis-methods.md | FMEA, FTA, HAZOP, Use Error Analysis methods |
| Stage | Key Activities | Output |
|---|---|---|
| Planning | Define scope, criteria, responsibilities | Risk Management Plan |
| Analysis | Identify hazards, estimate risk | Hazard Analysis |
| Evaluation | Compare to criteria, ALARP assessment | Risk Evaluation |
| Control | Implement hierarchy, verify | Risk Control Records |
| Residual | Overall assessment, benefit-risk | Risk Management Report |
| Production | Monitor, review, update | Updated RM File |
| Skill | Integration Point |
|---|---|
| quality-manager-qms-iso13485 | QMS integration |
| capa-officer | Risk-based CAPA |
| regulatory-affairs-head | Regulatory submissions |
| quality-documentation-manager | Risk file management |