Loading...
Loading...
Found 3 Skills
TestRail integration. Manage data, records, and automate workflows. Use when the user wants to interact with TestRail data.
Sync tests with TestRail. Use when user mentions "testrail", "test management", "test cases", "test run", "sync test cases", "push results to testrail", or "import from testrail".
File or link CawPlan defects from failed/blocked TestRail Results via QA Insights A4. Use when: SQA wants to turn a TestRail Failed/Blocked Result into a CawPlan Ticket, paste a tests/view URL to file a defect, review an A4 defect draft, create a BUGFIX/FEATURE ticket, or link an existing ticket back to TestRail defects. Cold start with tests/view MUST call execution failures --test-id BEFORE defects draft; never use test_id as the draft path result_id. A4 write path (create-ticket) MUST use --body-file or --body JSON — never field flags like --description or --result-id. NOT for: importing test cases (use `cawplan-testcase-import`); creating TestRail Plans/Runs (use `cawplan-testplan-layout`); release risk assessment; generating requirements or test points.